Menu
Podrška
Tehnička biblioteka

Tehnička biblioteka

Megger-ova tehnička biblioteka omogućava pristup brojnim dodatnim sadržajima i resursima, kao što su tehnička uputstva, napomene o primenama i drugo. Upotrebite ove filtre kako biste potražili posebne sadržaje (npr. napomene o primenama) ili suzili izbor rezultata pretrage na određenu oblast primene u elektroenergetici.  

 

Da biste videli dostupne sadržaje o određenoj temi ili pronašli određeni softver, unesite uslov pretrage u nastavku. Imajte na umu da ćete, ako želite da pristupate određenim resursima, morati da napravite nalog.

Filtriranje po vrsti primene:
    Prikazivanje stavke (stavki) 1 - 6 od 6 ukupno
Case Study on IDAX300 and VAX020
The Power Grid Corporation of India Limited (PGCIL) is an Indian state-owned company headquartered in Gurugram (North India) engaged mainly in Trans-mission  of  Power  and  transmits  about  50%  of  the  total  power  generated  in  India  on  its  transmission  network.  The  company  owns  and  operates  about  1,61,790  circuit  kms  of  transmission  lines  at  800/765 kV,  400 kV,  220 kV  &  132 kV EHVAC and +500 kV HVDC levels and 248 sub-stations. Also, it has the transformation capacity of about 396 825 MVA as of 30th November 2019.
Objavljeno: 26 avgust 2020
Preuzimanje PDF-a
DLRO2: long test lead test mode
When measuring very low resistance the four-wire test method has for many years been the standard method. The main advantage being that it simply and easily removes the resistance of the test leads from the measurement. However, what happens when those test leads need to be verylong?
Objavljeno: 27 jul 2020
Preuzimanje PDF-a
DLRO2: new difference meter
Introducing the first low resistance ohmmeter to feature a difference meter, a device that turns changes in resistance into a moving pointer and percentage change. When testing multiple similar connections, it makes it easy to spot those small increases in resistance that eventually turn into major faults.
Objavljeno: 27 jul 2020
Preuzimanje PDF-a
TTRU3 Calibration verification
When performing calibration verification of the TTRU3, the following factors need to be considered to achieve accurate measurements and prevent damage to your calibration fixture or TTRU3.
Objavljeno: 20 februar 2020
Preuzimanje PDF-a
Power Cable Fault Locating Safety Notice
REQUIREMENTS FOR SAFE WORK ENVIRONMENT WHEN PERFORMING MV or LV POWER CABLE FAULT LOCATING BY DISCHARGING A HIGH VOLTAGE CAPACITOR.
Objavljeno: 20 septembar 2019
Preuzimanje PDF-a
TTRU3 Phase Shifting Transformer App note
The is capable of performing turns ratio tests on any phase shifting transformer by allow-ing for phase shifts to be entered with respect to the secondary winding. But with all of the differ-ent ways phase shift is expressed, how do you know if the entered phase shift value is correct?
Objavljeno: 22 avgust 2019
Preuzimanje PDF-a